1 Location Port of Adabiya in Ain Sokhna Red Sea
2 Client ARMED FORCES ENGINEERING AUTHORITY
3 Owner
Suez Canal economic zone
4 Type of participation Sub-Contractor
5 Contract value 100,000,000 LE
6 Duration year 2019
7 Start Date - End Date 2017-06-01 to 2019-05-30
8 Project description

Establishment of a berth in the port of Adabiya in Ain Sokhna to provide logistics services for oil tankers.

9 Scope Of Work

• Constructing a 405 m berth consisting of:

- 37 piles of 120 cm diameter.
- 128 piles of 150 cm length of 38 meters.
- A walkway for the berth,

- Installing Finders, Quick release, Hand Rail and Ladders

10 Marine vessels used in the project -
11 Work volume
  Discerption comments
Water Depth 0 - 15 m - - -
No. Of Pipe lines 17 Pipe lines With Different diameters Between 120 – 150 cm diameter
Berth / Pier length 405 m Total Length 50 Km