LAYING 18 “ P/L SHOAB ALI TO RAS USH

- Pre Crossing.

- Laying Of 2 PL 18” (1.2 km)

- Installation of No.2 mechanical connectors.

- Free Span rectification

- Installation Of Spools

- Pigging & Hydrotest.

Construction Red sea
2

PETROWEB FIELD DEVELOPMENT

- Laying PL 8” (2.4 Km).

- Laying PL 14” (32.6 Km).

- Beach Pull.

- Post trenching

Construction Red sea
3

WDDM PHASE X DEVELOPMENT PROJECT

- Engineering and Procurement.

- 2 Umbilical power cable installation (5 KM & 2.5 KM)

- 3 Jumper Installation

- 4 Mud mats Installation

- 3 HFL Installation

- 12 EFL installation

Cable Laying , Procurement , Construction , Engineering Med sea
4
SPOOLS & RISER INSTALLATION @ GG FIELD

- Installation Of Riser.

- TSF Activites.

- Installation of Spools.

- Pigging & Hydrotest.

Construction MED SEA
5

LAYING 7” P/L THREADED

* Laying 7» Threaded P/L 10 Km.

* Installation Sools.

Construction MED SEA
6

SHORE PROTECTION FOR 24» P/L

Shore Protection For 24» P/L New Exposed Portion Between Nidoco 6,11 ( Phase II)

* Supply and Apply Materials For Shore Protection

Procurement , Construction RED SEA
7
AMAL B RISER REPAIR & 4” PIPELINE INSPECTION & REPAIR

* Install new riser @ AMAL A.

* Install new riser @ AMAL B.

* Installation two Smart Flang @ 4» P/L .

Repair , Inspection MED SEA
8
Overhauling Old SBM

* Dismantle the old SBM.

* Installation of SBM after Overhauling Maintenance .

* Leak Test for SBM System.

Maintenance MED SEA
9
ASHRAFI FIELD DEVELOPMENT.

Inspection Of 9 PL.

Construction RED SEA
10
22” P/L REPAIR ( 3 POINTS WITH 3 CLAMPS)

* Survey.

* Repair of 22” P/L by Installation Of 3 Clamps .

* Leak Test

Maintenance MED SEA
11
8” P/L OFFSHORE REPAIR

* Survey.

* Install Of Mechanical Connector.

Maintenance RED SEA
Projects.Year 2023
1

NORTH SAFA

Transportation & Installation of: North Safa Jacket. 560 ton & North Safa Drilling Deck. 400 ton Procurement of line pipes, bulk material, etc.Pre & Post Lay Survey Laying activities of 10 12 KM) and 11 8 KM)

Procurement , Construction RED SEA
2

OCTOBER FIELD DEVELOPMENT

*Laying of 18” PL from OCT C to OCT H (2.8 Km) (WD:60 m)

*Laying of 18” PL from OCT A to OCT P (1.9 Km) (WD:60 m)

*Spools,Risers,Freespan, Crossing & Precommissioning

Construction RED SEA
3
GG2 LAYING FOR THE 6” PIPELINE

GG2 Laying for the 6” pipeline between two platforms existing GG platform and new GG2- structure (water depth 65 m)

Construction RED SEA
4
WEB OFFSHORE FIELD DEVELOPMENT PROJECT

*Laying of 8” P/L from PAPYRUS to WEB P/F (2.6 Km) WD (19m)

*Laying of 14” P/L from WEB P/F to onshore (35 Km) WD (17m)

*Causeway & Trenching Activities Pre & Post Lay Survey

*Spools,Risers,Freespan,Crossing, & Precommissioning

Construction RED SEA
5

PETRECO

Laying of 14 inch Pl from PETRECO onshore to PP2- Platform (11 Km,) Causeway & Trenching Activities Spools,Risers,Freespan, Crossing & Precommissioning

Construction RED SEA
6
ANNUAL MAINTENANCE AGREEMENT

Inspection, Maintainance, Repair for 6 different P/F :

@ AMER2- P/F & @. AMER8-. P/F & @ AMER6- P/F & @ AMER5- P/F @ GG. PF @ SH-GH/2

Construction RED SEA
Projects.Year 2022
1
KAMOS 3A DEVELOPMENT

* Three(3) monopods P/F Installation & TSF 427.7 Ton , 382.8 Ton & 382.8 Ton

* Three(3)Pipe Lines Laying: 8” P/L ( 7.27 Km), 10” P/L ( 10 Km), 8” P/L (3 Km)

Construction MED SEA
2
SURVEY & REPAIR OF 22 INCH PIPELINE

Survey & Repair of 22 inch Pipeline

Repair , Inspection MED SEA
3

TWO HELIDECKS DEMOLISHING & INSTALLATION NEW HELIDECK

Two Helidecks Project Demolishing & New I nstallation New helideck M1 transportation & Installation BADRI new helideck Installation & Installation

Construction RED SEA
4
IN LINE INSPECTION

In Line inspection

Inspection MED SEA
5
ANNUAL MAINTENANCE AGREEMENT 2

Maintenance and Repair for Amer Field & Shohb Ghareb P/Fs Pre Lay Survey between GG P/F & GG2 P/F Platforms Sand Blasting & Painting

Maintenance RED SEA
6
PETROSALAM FIELD DEVELOPMENT

PetroSalam Plat form IMR 5.5» P/L Repair Survey &Installation of Seventy Mattresses

Maintenance RED SEA
7
GNN FIELD DEVELOPMENT

Engineering, Procurement, Installation and Commissioning of: 10” Geotechnical Soil Investigation Services Pipeline Laying (5km),Risers& Spools Pre & Post Lay Survey Conductor supporting structure (CSS) Top Side Facilities Connection of MOPU with CSS

Commissioning , Procurement , Construction , Engineering RED SEA
Projects.Year 2021
1

INSTALLATION OF GOS SUBSEA SPOOLS & REPAIRS

*Adjusting 18” New Riser Orientation

*Installation of 10 subsea spools For GOS PL

*Repair leak points by sectional replacement for the defected 24” P/L portion and replacing it with straight spools and 2 mech. connectors.

Maintenance , Repair RED SEA
2
ANNUAL MAINTENANCE AGREEMENT 3

Annual Maintenance Agreement for offshore platforms Maintenance and Repair for Amer Field & Shohb Ghareb P/Fs

Maintenance RED SEA
3
SOUTH-EAST ALHAMD AND NORTH AMER FIELD DEVELOPMENT PROJECT

• Laying of the Two power cables with lengths 1200 m /2000 m

•Causeway & Trenching Activities

• Pre & Post Lay Survey

• Laying of four pipelines 6 inches (3,3 &4&13.5) Km

Cable Laying , Construction RED SEA
4
PETROSALAM NORTHWEST OCTOBER COILED TUBE P/L

*Repair Demolish and recovery the existing coiled tubing pipeline.

*Demolish and recovery of 5 spools

*Fabricate and install 5 subsea spools

*Pre-commissioning Activities for the PL’s.

Repair RED SEA
5
PL ASSET INTEGRITY MGT.

PL Asset Integrity Mgt. UTILIZING Magnetometer T omography Method (MTM)

Inspection RED SEA
6
24” & 3” PIGGYBACK SUBSEA PIPELINES

OFFSHORE AND ONSHORE LAYING FOR 3 & ”24” PIGGYBACK SUBSEA PIPELINES. *Pre & Post Lay Survey

Procurement RED SEA
7
LOADING TERMINAL UPGRADE

Upgrading of Existing Suez Oil Processing Company Loading Terminal, Gulf of Suez

Maintenance , Construction RED SEA
8
Zaafarana Ras Budran Survey

Zaafarana Ras Budran Geophysical and Geotechnical Survey

Survey RED SEA
9
FIRE FIGHTING CIVIL WORK, INSTALLATION FOR THE SYSTEM

*Purchasing & Commissioning and Start-up. for fire detection devices.

*Control system (SCADA AND PLC).

*Firefighting system (pipes, valves, monitor, FM200 systems and pumps), *Civil work, Installation for the supplied material pre-commissioning & commissioning.

Commissioning , Procurement , Construction RED SEA
10
(FPSO) STEEL RENEWAL

Floating Production Storage and Offloading (FPSO) Steel Renewal ( Procurement,Fabrication,Transportation, Installation and NDT) (70 Ton)

Maintenance RED SEA
11
CABLE REPAIR

ZAAFARANA Inspection & Repair of Subsea Cable Installation engineering & method statement Survey for cable entrance to FPSO.

Material supply for cable termination, splicing and termination, Inspection & testing

Maintenance , Repair , Inspection , Procurement , Engineering RED SEA
12

INSPECTION MAINTAINANCE & REPAIR (IMR) BY WROV PMS-BURULLUS

*IMR utilized by W-ROV on Barboui /Seth Platforms from (-20m to -83m).

*IMR by divers on Temsah-4/ Temsah-2 / SE-2 / Darfel / Port Fouad / SW-2 / PF-D / SE-1 / RPP platforms from 0 to -30 m water depths

*Baltim East Boat landing replacement and platform fabric repair.

Maintenance , Repair , Inspection MED SEA
13

INSPECTION MAINTAINANCE & REPAIR (IMR) DIVERS PMS-17

*Revamping (6) Six Plat forms.

* Deck extension installation for new well.

Maintenance , Repair , Inspection , Construction RED SEA
14

ZOHR FIELD DEVELOPMENT 2

measurements and General visual inspection (GVI) for all ZOHR field subsea structures.

Boatlanding repair, Repair the emergency life buoy box,Repair the damaged platform items handrails, ladders, satellite base, wind sockets and cable trays

Maintenance , Repair , Inspection MED SEA
15
AL AMAL (A) PLATFORM REHABILITATION

AL AMAL (A) Platform REHABILITATION

Maintenance RED SEA
16
NEW MANSOURA WATER DESALINATION PLANT

New Mansoura Water Desalination Plant Installation of 500 m long sheet pile cofferdam Provide sheet pile driving equipment Vibrohammers, Guide frames, and lifting gears.

Construction MED SEA
Projects.Year 2020
1

8” P/L REPAIR (M-1TO BADRI –E.W.I)

8” Repair (M-1to Badri –E.w.i)Installation of two smart flanges Installation of new spool piece (fabrication by GUPCO)

Repair RED SEA
2

REPAIR TWO PL 18 “& 24”

Repair Two PL 18 “& 24” Installing Mechanical Connectors

Repair RED SEA
3
WEST AKHEN P/F BOAT LANDING REPAIR

WEST AKHEN P/F Boat Landing Repair

Repair MED SEA
4

LAYING OF 18 INCH P/L FROM PETRECO ONSHORE TO PP-2 PLATFORM

Laying of 18 inch P/L from PETRECO onshore to PP-2 Platform Causeway & Trenching Activities 11 Km, Pre & Post Lay Survey

Construction RED SEA
5
BOAT LANDING ON RB-B P/F REPLACEMENT

Demolish old boat landing on RB-B P/F Fabrication of New Boat Land (65 Ton, 18m x 6,5m x 3m) Installation of new boat landing on RB-B P/F

Maintenance RED SEA
6
ANNUAL MAINTENANCE AGREEMENT 4

SE-El Hamad P/F Relihabitation GG P/F Relihabitation AMER 6- Platform Sand Blasting & Painting Pipelines Inspection Survey & Cathodic Protection Inspection

Maintenance , Repair , Inspection RED SEA
Projects.Year 2019
1

Laying of 18” OCTOBER /R-BAKR & 12” JWF/J10- PIPELINES

Laying of 18” OCTOBER /R-BAKR & 12” JWF/J10- PIPELINES Causeway & Trenching Activities 11 Km, Pre & Post Lay Survey

Construction RED SEA
2

RISER GUARD INSTALLATION , FORTY TWO MATTRESSES INSTALLATION

Riser Guard Installation , Forty two Mattresses Installation

Construction RED SEA
3

LAYING OF 12 INCH P/L

Laying of 12 inch Gas P/L 4.5 Km

Construction RED SEA
4
ANNUAL MAINTENANCE AGREEMENT 5

Annual Maintenance agreement for offshore platforms

Maintenance , Repair RED SEA
5

SHORE PROTECTION FROM EROSION

Shore Protection from Erosion (Eight Groins Construction )

Construction RED SEA
6

ZOHR PHASE 3

BSW Platform Transportation & Installation * Subsea Template (93.6 Ton) BSW Jacket (710 Ton) BSW Deck (1690 Ton). *Hook up Activities on BSW Platform

Construction MED SEA
7

SHORE PROTECTION FOR NIDOCO 6 & 11 WELL AREA

Construction Works of Shore Protection for Nidoco 11 & 6 Well Area

Construction RED SEA
8
MAINTENANCE & REPAIR

Maintenance & Repair utilizing PMS-BURULLUS (Multi Purpose Vessel)

Maintenance , Repair MED SEA
9
LAYING OF NEW CARGO 36” OFFSHORE PIPELINE

* 36” Pipeline Laying + cofferdam with total length (300m offshore + 24m onshore).

* SPM Installation at El-Hamra Terminal

* Pre-Commissioning & De-Watering

Construction MED SEA
10
LAYING OF 12 INCH P/L 2

Laying of 12 inch Pl ,Pre & Post Lay Survey Causeway & Trenching Activities 11 Km

Construction RED SEA
11
SOUTH RAMADAN

South Ramadan SRM 2 Rehabilitation (Phase 2)

Maintenance , Repair RED SEA
Projects.Year 2018
1

BALTIM BSW FIELD DEVELOPMENT

* Laying of 26” P/L (17 Km) , Causeway & Trenching Activities

* BSW Plat Form Installation: Jacket (710 Ton), Template (93.6 Ton), Deck (1690Ton)

* Umbilical Cable laying. Hook Up Activitiesa

Cable Laying , Construction MED SEA
2
ZHOR FIELD DEVELOPMENT PROJECT - PHASE II

* Construction 2 causeway (width 15m & length 782m).

* Driving 2606 sheet piles. Excavation trench (width 35m & length 782m).

* Four (4)Pipe Lines Laying : 30” P/L 17 .5km, 30” P/L 2.1km, 14” P/L 2 .1km,

Construction MED SEA
3
MAINTENANCE, REVAMPING &REPAIR

Maintenance, Revamping &Repair utilizing PMS-BURULLUS (Multi Purpose Vessel)

Maintenance , Repair MED SEA
4
ANNUAL MAINTENANCE AGREEMENT 6

Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance

Maintenance , Repair , Inspection RED SEA
5

ASHRAFI PLATFORM REHABILITATION

Ashrafi Platform Rehabilitation

Maintenance , Repair , Inspection RED SEA
6

LAYING OF 6” SUBSEA PIPELINE

Laying Of 6” Subsea Pipeline Connecting WAQ/ AQPII platforms

Construction MED SEA
7
EXPANSION OF THE THIRD BASIN IN AIN SOKHNA 2

Expansion of the third basin in Ain Sokhna 

Construction RED SEA
8

ZHOR FIELD DEVELOPMENT

* Dismantle the old SBM.

* Installation of SBM after Overhauling Maintenance.

* Leak Test for SBM System.

Maintenance MED SEA
Projects.Year 2017
1
NAO & HH FIELD DEVELOPMENT 2

NAO P/F installation : Jacket 120 ton / Deck 460 ton/ Piles 391 ton

HH P/F installation : Jacket 191 ton / Deck 445 ton / Piles 335 ton

6 Pipe Line Laying with wall thickness of 0.5 Inch and 8 Km Length.

Construction RED SEA
2
ANNUAL MAINTENANCE AGREEMENT 7

Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance

Maintenance RED SEA
3
EL HAMAD REHALIBATATION

El Hamad Rehalibatation

Repair , Inspection , Construction RED SEA
4

ZOHR CCP INSTALLATION AND TRANSPORTATION

Zohr CCP Installation and Transportation of Zohr CCP Jacket (1942) ton , Piles (997) ton and Deck (1881) ton

Construction MED SEA
5

ZHOR FIELD DEVELOPMENT PROJECT PHASE I (ASU)

Construction 2 causeway (width 10m & length 540m).

* Excavation trench (width 20m & length 540m)

* Laying of 26” P/L 5. 19km. * Laying of 14” P/L 5. 31km.

* Laying of 8” P/L 39 km.

Construction MED SEA
6
LAYING OF 10” P/L FROM AMAL-A P/F TO AMAL-C P/F

Laying of 10” P/L from Amal-A P/F to Amal-C P/F location 1.3Km Installation of Amal-C Jacket (330) ton Installation of Deck Extension at Amal-A.(413) ton Topside modification works at Amal-A. 10” Riser and Clamps Installation at Amal-A. Topside modification at Amal-B P/F.s

Construction RED SEA
Projects.Year 2016
1
Annual Maintenance agreement 8

Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance

Maintenance , Repair , Inspection RED SEA
2
MUZHIL OIL FIELD DEVELOPMENT

Muzhil oil field Development Project. laying of 4.5” P/L. Pre/Post survey activities

Construction RED SEA
3
INSPECTION & REHABILITATION SERVICES FOR GEMSA & ZAAFARANA FIELDS

Inspection Services For GEMSA & ZAAFARANA Fields, Provide Welding inspection services,NDTservices, Radiography services, Painting Inspection. Rehabitation of FPSO Ballast tanks

Maintenance , Repair , Inspection RED SEA
Projects.Year 2015
1

INSPECTION, REPAIR AND MAINTENANCE

Inspection, Repair and Maintenance at G.O.S Field

Maintenance , Repair , Inspection RED SEA
2

10” P/L LAYING

laying, of 10” PSFW-2 to RPP P/L

Construction RED SEA
3
PEDESTAL CRANE INSTALLATION

Offshore transportation & installation of pedestal crane on Platform A

Maintenance RED SEA
4
INSPECTION FIRE FIGHTING LINES

Inspection fire fighting Lines

Inspection MED SEA
5
ANNUAL MAINTENANCE AGREEMENT 9

Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance

Maintenance , Repair , Inspection RED SEA
6
MUZHIL OIL FIELD DEVELOPMENT 2

Installation of Jacket and deck Laying of 2 new pipelines 10 & ”8” P/L 8Km

Construction RED SEA