Projects.Num | Projects.Client | Projects.ProjectName | Projects.ScopeOfWork | Projects.ServiceCategory | Projects.LocationTable |
---|---|---|---|---|---|
Projects.Year 2024 | |||||
1 | LAYING 18 “ P/L SHOAB ALI TO RAS USH | - Pre Crossing. - Laying Of 2 PL 18” (1.2 km) - Installation of No.2 mechanical connectors. - Free Span rectification - Installation Of Spools - Pigging & Hydrotest. | Construction | Red sea | |
2 | PETROWEB FIELD DEVELOPMENT | - Laying PL 8” (2.4 Km). - Laying PL 14” (32.6 Km). - Beach Pull. - Post trenching | Construction | Red sea | |
3 | ![]() | WDDM PHASE X DEVELOPMENT PROJECT | - Engineering and Procurement. - 2 Umbilical power cable installation (5 KM & 2.5 KM) - 3 Jumper Installation - 4 Mud mats Installation - 3 HFL Installation - 12 EFL installation | Cable Laying , Procurement , Construction , Engineering | Med sea |
4 | SPOOLS & RISER INSTALLATION @ GG FIELD | - Installation Of Riser. - TSF Activites. - Installation of Spools. - Pigging & Hydrotest. | Construction | MED SEA | |
5 | LAYING 7” P/L THREADED | * Laying 7» Threaded P/L 10 Km. * Installation Sools. | Construction | MED SEA | |
6 | SHORE PROTECTION FOR 24» P/L | Shore Protection For 24» P/L New Exposed Portion Between Nidoco 6,11 ( Phase II) * Supply and Apply Materials For Shore Protection | Procurement , Construction | RED SEA | |
7 | AMAL B RISER REPAIR & 4” PIPELINE INSPECTION & REPAIR | * Install new riser @ AMAL A. * Install new riser @ AMAL B. * Installation two Smart Flang @ 4» P/L . | Repair , Inspection | MED SEA | |
8 | Overhauling Old SBM | * Dismantle the old SBM. * Installation of SBM after Overhauling Maintenance . * Leak Test for SBM System. | Maintenance | MED SEA | |
9 | ASHRAFI FIELD DEVELOPMENT. | Inspection Of 9 PL. | Construction | RED SEA | |
10 | 22” P/L REPAIR ( 3 POINTS WITH 3 CLAMPS) | * Survey. * Repair of 22” P/L by Installation Of 3 Clamps . * Leak Test | Maintenance | MED SEA | |
11 | 8” P/L OFFSHORE REPAIR | * Survey. * Install Of Mechanical Connector. | Maintenance | RED SEA | |
Projects.Year 2023 | |||||
1 | NORTH SAFA | Transportation & Installation of: North Safa Jacket. 560 ton & North Safa Drilling Deck. 400 ton Procurement of line pipes, bulk material, etc.Pre & Post Lay Survey Laying activities of 10 12 KM) and 11 8 KM) | Procurement , Construction | RED SEA | |
2 | OCTOBER FIELD DEVELOPMENT | *Laying of 18” PL from OCT C to OCT H (2.8 Km) (WD:60 m) *Laying of 18” PL from OCT A to OCT P (1.9 Km) (WD:60 m) *Spools,Risers,Freespan, Crossing & Precommissioning | Construction | RED SEA | |
3 | GG2 LAYING FOR THE 6” PIPELINE | GG2 Laying for the 6” pipeline between two platforms existing GG platform and new GG2- structure (water depth 65 m) | Construction | RED SEA | |
4 | WEB OFFSHORE FIELD DEVELOPMENT PROJECT | *Laying of 8” P/L from PAPYRUS to WEB P/F (2.6 Km) WD (19m) *Laying of 14” P/L from WEB P/F to onshore (35 Km) WD (17m) *Causeway & Trenching Activities Pre & Post Lay Survey *Spools,Risers,Freespan,Crossing, & Precommissioning | Construction | RED SEA | |
5 | PETRECO | Laying of 14 inch Pl from PETRECO onshore to PP2- Platform (11 Km,) Causeway & Trenching Activities Spools,Risers,Freespan, Crossing & Precommissioning | Construction | RED SEA | |
6 | ANNUAL MAINTENANCE AGREEMENT | Inspection, Maintainance, Repair for 6 different P/F : @ AMER2- P/F & @. AMER8-. P/F & @ AMER6- P/F & @ AMER5- P/F @ GG. PF @ SH-GH/2 | Construction | RED SEA | |
Projects.Year 2022 | |||||
1 | KAMOS 3A DEVELOPMENT | * Three(3) monopods P/F Installation & TSF 427.7 Ton , 382.8 Ton & 382.8 Ton * Three(3)Pipe Lines Laying: 8” P/L ( 7.27 Km), 10” P/L ( 10 Km), 8” P/L (3 Km) | Construction | MED SEA | |
2 | SURVEY & REPAIR OF 22 INCH PIPELINE | Survey & Repair of 22 inch Pipeline | Repair , Inspection | MED SEA | |
3 | TWO HELIDECKS DEMOLISHING & INSTALLATION NEW HELIDECK | Two Helidecks Project Demolishing & New I nstallation New helideck M1 transportation & Installation BADRI new helideck Installation & Installation | Construction | RED SEA | |
4 | IN LINE INSPECTION | In Line inspection | Inspection | MED SEA | |
5 | ANNUAL MAINTENANCE AGREEMENT 2 | Maintenance and Repair for Amer Field & Shohb Ghareb P/Fs Pre Lay Survey between GG P/F & GG2 P/F Platforms Sand Blasting & Painting | Maintenance | RED SEA | |
6 | PETROSALAM FIELD DEVELOPMENT | PetroSalam Plat form IMR 5.5» P/L Repair Survey &Installation of Seventy Mattresses | Maintenance | RED SEA | |
7 | GNN FIELD DEVELOPMENT | Engineering, Procurement, Installation and Commissioning of: 10” Geotechnical Soil Investigation Services Pipeline Laying (5km),Risers& Spools Pre & Post Lay Survey Conductor supporting structure (CSS) Top Side Facilities Connection of MOPU with CSS | Commissioning , Procurement , Construction , Engineering | RED SEA | |
Projects.Year 2021 | |||||
1 | INSTALLATION OF GOS SUBSEA SPOOLS & REPAIRS | *Adjusting 18” New Riser Orientation *Installation of 10 subsea spools For GOS PL *Repair leak points by sectional replacement for the defected 24” P/L portion and replacing it with straight spools and 2 mech. connectors. | Maintenance , Repair | RED SEA | |
2 | ANNUAL MAINTENANCE AGREEMENT 3 | Annual Maintenance Agreement for offshore platforms Maintenance and Repair for Amer Field & Shohb Ghareb P/Fs | Maintenance | RED SEA | |
3 | SOUTH-EAST ALHAMD AND NORTH AMER FIELD DEVELOPMENT PROJECT | • Laying of the Two power cables with lengths 1200 m /2000 m •Causeway & Trenching Activities • Pre & Post Lay Survey • Laying of four pipelines 6 inches (3,3 &4&13.5) Km | Cable Laying , Construction | RED SEA | |
4 | PETROSALAM NORTHWEST OCTOBER COILED TUBE P/L | *Repair Demolish and recovery the existing coiled tubing pipeline. *Demolish and recovery of 5 spools *Fabricate and install 5 subsea spools *Pre-commissioning Activities for the PL’s. | Repair | RED SEA | |
5 | PL ASSET INTEGRITY MGT. | PL Asset Integrity Mgt. UTILIZING Magnetometer T omography Method (MTM) | Inspection | RED SEA | |
6 | 24” & 3” PIGGYBACK SUBSEA PIPELINES | OFFSHORE AND ONSHORE LAYING FOR 3 & ”24” PIGGYBACK SUBSEA PIPELINES. *Pre & Post Lay Survey | Procurement | RED SEA | |
7 | LOADING TERMINAL UPGRADE | Upgrading of Existing Suez Oil Processing Company Loading Terminal, Gulf of Suez | Maintenance , Construction | RED SEA | |
8 | Zaafarana Ras Budran Survey | Zaafarana Ras Budran Geophysical and Geotechnical Survey | Survey | RED SEA | |
9 | FIRE FIGHTING CIVIL WORK, INSTALLATION FOR THE SYSTEM | *Purchasing & Commissioning and Start-up. for fire detection devices. *Control system (SCADA AND PLC). *Firefighting system (pipes, valves, monitor, FM200 systems and pumps), *Civil work, Installation for the supplied material pre-commissioning & commissioning. | Commissioning , Procurement , Construction | RED SEA | |
10 | (FPSO) STEEL RENEWAL | Floating Production Storage and Offloading (FPSO) Steel Renewal ( Procurement,Fabrication,Transportation, Installation and NDT) (70 Ton) | Maintenance | RED SEA | |
11 | CABLE REPAIR | ZAAFARANA Inspection & Repair of Subsea Cable Installation engineering & method statement Survey for cable entrance to FPSO. Material supply for cable termination, splicing and termination, Inspection & testing | Maintenance , Repair , Inspection , Procurement , Engineering | RED SEA | |
12 | INSPECTION MAINTAINANCE & REPAIR (IMR) BY WROV PMS-BURULLUS | *IMR utilized by W-ROV on Barboui /Seth Platforms from (-20m to -83m). *IMR by divers on Temsah-4/ Temsah-2 / SE-2 / Darfel / Port Fouad / SW-2 / PF-D / SE-1 / RPP platforms from 0 to -30 m water depths *Baltim East Boat landing replacement and platform fabric repair. | Maintenance , Repair , Inspection | MED SEA | |
13 | INSPECTION MAINTAINANCE & REPAIR (IMR) DIVERS PMS-17 | *Revamping (6) Six Plat forms. * Deck extension installation for new well. | Maintenance , Repair , Inspection , Construction | RED SEA | |
14 | ZOHR FIELD DEVELOPMENT 2 | measurements and General visual inspection (GVI) for all ZOHR field subsea structures. Boatlanding repair, Repair the emergency life buoy box,Repair the damaged platform items handrails, ladders, satellite base, wind sockets and cable trays | Maintenance , Repair , Inspection | MED SEA | |
15 | AL AMAL (A) PLATFORM REHABILITATION | AL AMAL (A) Platform REHABILITATION | Maintenance | RED SEA | |
16 | NEW MANSOURA WATER DESALINATION PLANT | New Mansoura Water Desalination Plant Installation of 500 m long sheet pile cofferdam Provide sheet pile driving equipment Vibrohammers, Guide frames, and lifting gears. | Construction | MED SEA | |
Projects.Year 2020 | |||||
1 | 8” P/L REPAIR (M-1TO BADRI –E.W.I) | 8” Repair (M-1to Badri –E.w.i)Installation of two smart flanges Installation of new spool piece (fabrication by GUPCO) | Repair | RED SEA | |
2 | REPAIR TWO PL 18 “& 24” | Repair Two PL 18 “& 24” Installing Mechanical Connectors | Repair | RED SEA | |
3 | WEST AKHEN P/F BOAT LANDING REPAIR | WEST AKHEN P/F Boat Landing Repair | Repair | MED SEA | |
4 | LAYING OF 18 INCH P/L FROM PETRECO ONSHORE TO PP-2 PLATFORM | Laying of 18 inch P/L from PETRECO onshore to PP-2 Platform Causeway & Trenching Activities 11 Km, Pre & Post Lay Survey | Construction | RED SEA | |
5 | BOAT LANDING ON RB-B P/F REPLACEMENT | Demolish old boat landing on RB-B P/F Fabrication of New Boat Land (65 Ton, 18m x 6,5m x 3m) Installation of new boat landing on RB-B P/F | Maintenance | RED SEA | |
6 | ANNUAL MAINTENANCE AGREEMENT 4 | SE-El Hamad P/F Relihabitation GG P/F Relihabitation AMER 6- Platform Sand Blasting & Painting Pipelines Inspection Survey & Cathodic Protection Inspection | Maintenance , Repair , Inspection | RED SEA | |
Projects.Year 2019 | |||||
1 | Laying of 18” OCTOBER /R-BAKR & 12” JWF/J10- PIPELINES | Laying of 18” OCTOBER /R-BAKR & 12” JWF/J10- PIPELINES Causeway & Trenching Activities 11 Km, Pre & Post Lay Survey | Construction | RED SEA | |
2 | RISER GUARD INSTALLATION , FORTY TWO MATTRESSES INSTALLATION | Riser Guard Installation , Forty two Mattresses Installation | Construction | RED SEA | |
3 | LAYING OF 12 INCH P/L | Laying of 12 inch Gas P/L 4.5 Km | Construction | RED SEA | |
4 | ANNUAL MAINTENANCE AGREEMENT 5 | Annual Maintenance agreement for offshore platforms | Maintenance , Repair | RED SEA | |
5 | SHORE PROTECTION FROM EROSION | Shore Protection from Erosion (Eight Groins Construction ) | Construction | RED SEA | |
6 | ZOHR PHASE 3 | BSW Platform Transportation & Installation * Subsea Template (93.6 Ton) BSW Jacket (710 Ton) BSW Deck (1690 Ton). *Hook up Activities on BSW Platform | Construction | MED SEA | |
7 | SHORE PROTECTION FOR NIDOCO 6 & 11 WELL AREA | Construction Works of Shore Protection for Nidoco 11 & 6 Well Area | Construction | RED SEA | |
8 | MAINTENANCE & REPAIR | Maintenance & Repair utilizing PMS-BURULLUS (Multi Purpose Vessel) | Maintenance , Repair | MED SEA | |
9 | LAYING OF NEW CARGO 36” OFFSHORE PIPELINE | * 36” Pipeline Laying + cofferdam with total length (300m offshore + 24m onshore). * SPM Installation at El-Hamra Terminal * Pre-Commissioning & De-Watering | Construction | MED SEA | |
10 | LAYING OF 12 INCH P/L 2 | Laying of 12 inch Pl ,Pre & Post Lay Survey Causeway & Trenching Activities 11 Km | Construction | RED SEA | |
11 | SOUTH RAMADAN | South Ramadan SRM 2 Rehabilitation (Phase 2) | Maintenance , Repair | RED SEA | |
Projects.Year 2018 | |||||
1 | BALTIM BSW FIELD DEVELOPMENT | * Laying of 26” P/L (17 Km) , Causeway & Trenching Activities * BSW Plat Form Installation: Jacket (710 Ton), Template (93.6 Ton), Deck (1690Ton) * Umbilical Cable laying. Hook Up Activitiesa | Cable Laying , Construction | MED SEA | |
2 | ZHOR FIELD DEVELOPMENT PROJECT - PHASE II | * Construction 2 causeway (width 15m & length 782m). * Driving 2606 sheet piles. Excavation trench (width 35m & length 782m). * Four (4)Pipe Lines Laying : 30” P/L 17 .5km, 30” P/L 2.1km, 14” P/L 2 .1km, | Construction | MED SEA | |
3 | MAINTENANCE, REVAMPING &REPAIR | Maintenance, Revamping &Repair utilizing PMS-BURULLUS (Multi Purpose Vessel) | Maintenance , Repair | MED SEA | |
4 | ANNUAL MAINTENANCE AGREEMENT 6 | Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance | Maintenance , Repair , Inspection | RED SEA | |
5 | ASHRAFI PLATFORM REHABILITATION | Ashrafi Platform Rehabilitation | Maintenance , Repair , Inspection | RED SEA | |
6 | LAYING OF 6” SUBSEA PIPELINE | Laying Of 6” Subsea Pipeline Connecting WAQ/ AQPII platforms | Construction | MED SEA | |
7 | ![]() | EXPANSION OF THE THIRD BASIN IN AIN SOKHNA 2 | Expansion of the third basin in Ain Sokhna | Construction | RED SEA |
8 | ZHOR FIELD DEVELOPMENT | * Dismantle the old SBM. * Installation of SBM after Overhauling Maintenance. * Leak Test for SBM System. | Maintenance | MED SEA | |
Projects.Year 2017 | |||||
1 | NAO & HH FIELD DEVELOPMENT 2 | NAO P/F installation : Jacket 120 ton / Deck 460 ton/ Piles 391 ton HH P/F installation : Jacket 191 ton / Deck 445 ton / Piles 335 ton 6 Pipe Line Laying with wall thickness of 0.5 Inch and 8 Km Length. | Construction | RED SEA | |
2 | ANNUAL MAINTENANCE AGREEMENT 7 | Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance | Maintenance | RED SEA | |
3 | EL HAMAD REHALIBATATION | El Hamad Rehalibatation | Repair , Inspection , Construction | RED SEA | |
4 | ZOHR CCP INSTALLATION AND TRANSPORTATION | Zohr CCP Installation and Transportation of Zohr CCP Jacket (1942) ton , Piles (997) ton and Deck (1881) ton | Construction | MED SEA | |
5 | ZHOR FIELD DEVELOPMENT PROJECT PHASE I (ASU) | Construction 2 causeway (width 10m & length 540m). * Excavation trench (width 20m & length 540m) * Laying of 26” P/L 5. 19km. * Laying of 14” P/L 5. 31km. * Laying of 8” P/L 39 km. | Construction | MED SEA | |
6 | LAYING OF 10” P/L FROM AMAL-A P/F TO AMAL-C P/F | Laying of 10” P/L from Amal-A P/F to Amal-C P/F location 1.3Km Installation of Amal-C Jacket (330) ton Installation of Deck Extension at Amal-A.(413) ton Topside modification works at Amal-A. 10” Riser and Clamps Installation at Amal-A. Topside modification at Amal-B P/F.s | Construction | RED SEA | |
Projects.Year 2016 | |||||
1 | Annual Maintenance agreement 8 | Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance | Maintenance , Repair , Inspection | RED SEA | |
2 | MUZHIL OIL FIELD DEVELOPMENT | Muzhil oil field Development Project. laying of 4.5” P/L. Pre/Post survey activities | Construction | RED SEA | |
3 | INSPECTION & REHABILITATION SERVICES FOR GEMSA & ZAAFARANA FIELDS | Inspection Services For GEMSA & ZAAFARANA Fields, Provide Welding inspection services,NDTservices, Radiography services, Painting Inspection. Rehabitation of FPSO Ballast tanks | Maintenance , Repair , Inspection | RED SEA | |
Projects.Year 2015 | |||||
1 | INSPECTION, REPAIR AND MAINTENANCE | Inspection, Repair and Maintenance at G.O.S Field | Maintenance , Repair , Inspection | RED SEA | |
2 | 10” P/L LAYING | laying, of 10” PSFW-2 to RPP P/L | Construction | RED SEA | |
3 | PEDESTAL CRANE INSTALLATION | Offshore transportation & installation of pedestal crane on Platform A | Maintenance | RED SEA | |
4 | INSPECTION FIRE FIGHTING LINES | Inspection fire fighting Lines | Inspection | MED SEA | |
5 | ANNUAL MAINTENANCE AGREEMENT 9 | Maintenance for offshore platforms Ame 5, Amer 8, Amer 2, Amer 4 Platforms Inspection and Maintenance | Maintenance , Repair , Inspection | RED SEA | |
6 | MUZHIL OIL FIELD DEVELOPMENT 2 | Installation of Jacket and deck Laying of 2 new pipelines 10 & ”8” P/L 8Km | Construction | RED SEA |